BIM model update

All the applications allow for a continuous update of the information, since a connection between the BIM model and the elements managed by each application is established from the initial import.

Carry out your projects together
Progressive definition

By working with specific and independent applications, the project is defined progressively. In other words, different layers of information (structure, building services, energy analysis, etc.) are added to the initial physical model using specialised applications.

This way, the solutions users and technical specialists establish for each field, are incorporated during their corresponding project stage, and not at the start, when it is not yet possible to establish these specific solutions precisely, since many decisions have yet to be made.

Progressive definition

By working with specific and independent applications, the project is defined progressively. In other words, different layers of information (structure, building services, energy analysis, etc.) are added to the initial physical model using specialised applications.

This way, the solutions users and technical specialists establish for each field, are incorporated during their corresponding project stage, and not at the start, when it is not yet possible to establish these specific solutions precisely, since many decisions have yet to be made.

Alternative solutions

When the project designer is faced with a design problem, he/she usually has to evaluate different solutions or proposals. As alternative options are rejected and decisions are made, more detailed work is carried out on them, to achieve greater definition.

In the Open BIM flow, as well as making the progressive definition of the project a reality using specialised applications, each analysis model is independent from the rest, so different solutions for the same field can be proposed and defined, since the other models are not affected no matter what decision is made.

Alternative solutions

When the project designer is faced with a design problem, he/she usually has to evaluate different solutions or proposals. As alternative options are rejected and decisions are made, more detailed work is carried out on them, to achieve greater definition.

In the Open BIM flow, as well as making the progressive definition of the project a reality using specialised applications, each analysis model is independent from the rest, so different solutions for the same field can be proposed and defined, since the other models are not affected no matter what decision is made.

Secure storage

This updating process guarantees that, if changes occur in the BIM model, the information that has been introduced by team members is not lost, and only the work that remains obsolete in the face of these changes can be discarded by users.

Additionally, the project information is always distributed depending on the discipline, so specialists only manage and supervise the data that affects their specific field of work. This way, projects are developed in an efficient and secure work space, since it adapts itself to the needs of each project and all participants move in the same direction.

Secure storage

This updating process guarantees that, if changes occur in the BIM model, the information that has been introduced by team members is not lost, and only the work that remains obsolete in the face of these changes can be discarded by users.

Additionally, the project information is always distributed depending on the discipline, so specialists only manage and supervise the data that affects their specific field of work. This way, projects are developed in an efficient and secure work space, since it adapts itself to the needs of each project and all participants move in the same direction.